EIAA Epsilon Iota Alumni Association

3Apr/11Off

WWOLFPAC 2011

The summer WWOLFPAC project to upgrade the porch will take place the weekend of August 5-7. The main project will encompass removing the existing tile surface and replacing with composite decking. Key skills would include swinging a sledge, moving debris, measuring and cutting to length, and operating a power driver. You are all capable of helping, and I encourage anyone and everyone to help. Depending on attendance, we may also tackle a number of other smaller maintenance type projects. The actives will be making an exploratory hole to determine current porch construction around April-ish. More detailed planning can be done after the existing structure is fully investigated. Aren Paster TEPEIAA #356 Remember, if you can't attend, you can always make a donation via our Dues & Donations page.
Join the forum discussion on this post

Posted by Mr. Softee

Filed under: WWOLFPAC Comments Off
Comments (0) Trackbacks (0)

Sorry, the comment form is closed at this time.

Trackbacks are disabled.